Isolation of Loco KAVACH
18 Oct 2026LOCO KAVACH ISOLATION THROUGH MCB
Important Notice for Loco Pilots
Subject: Isolation of Onboard Loco Kavach
Isolation of onboard Loco Kavach when required by authorised instructions.
All Loco Pilots are advised to familiarise themselves with the location of the Kavach isolation MCB provided inside the machine room on the Cab-1 Loco Pilot (LP) side of the locomotive.
As per the instructions applicable to the relevant section, isolation of onboard Loco Kavach may be required in areas where Kavach operation is not permitted or when isolation is specifically instructed by the competent railway authority for installation, testing, commissioning, equipment-related or other authorised operational reasons.
Location of Kavach Isolation MCB
The Kavach MCB is generally located inside the machine room on the Cab-1 LP side, as shown in the instructional videos below.
Kavach MCB in a box unit
Kavach MCB and bypass selector switch
Instructions for Loco Pilots
1. Identify the Correct MCB
Before carrying out any instructed isolation, identify the MCB associated with the Kavach equipment in the designated enclosure.
2. Follow Authorised Instructions
Operate the isolation MCB only when required by applicable railway instructions or directions of the competent authority.
3. Observe the Prescribed Procedure
Follow the approved locomotive-specific Kavach isolation procedure, including any required reporting, recording and operational precautions.
4. Do Not Confuse the Controls
The MCB and rotary bypass selector switch are separate controls. Do not assume that operating the bypass switch is equivalent to electrical isolation.
5. Restoration of Kavach
Restore Kavach only as permitted under the applicable instructions and prescribed procedure.
Kavach Isolation – Instructional Videos
Reference videos for different locomotive types and Kavach equipment configurationsType 1 : Kavach Isolation - MEDHA
Location and identification of the isolation MCB.
Type 2 : Kavach Isolation - HBL
Location and identification of the isolation MCB.
Important Operational Reminder
For sections where Kavach isolation has been instructed during installation and testing activities, such as the HWH–JSG section referred to in the relevant railway communication, Loco Pilots must comply with the applicable instructions for the relevant section and period of operation.