Instruction for "Not keeping Locomotives under IOL"
TechnicalCircular Number: DCKP/CIR/TechEL/09-04-2026/10.244.207.211/1
Not Keeping Locomotives under IOL
Mandatory Instructions for LPsThe circular issued by the Chief Electrical Distribution Engineer, S.E.R., dated 25.02.2026, instructs that caution boards must be installed at two locations before every Insulated Overlap (IOL), irrespective of the distance from the signal.
📋 Caution Board Specifications
👷 Compliance & Responsibilities
Loco crews must be instructed through SrDEE/OP to follow the caution boards and avoid stopping electric locomotives/MUs under IOL.
Existing boards that do not meet the specified requirements must be replaced.
The Construction & Project Unit must ensure compliance with all IOL caution-board provisions.