SPAD of Train No. 12392 at Fatuha Station
Safety
Circular Number:
CKP/CIR/Safety/02-07-2026/10.244.207.211/1
๐ Viewed 50 times
Railway Board Directives โ SPAD & Side Collision Incidents
Subject: SPAD of Train No. 12392 at Fatuha Station over Danapur Division of ECR on 27.04.2026 and side collision at Dalauda Station Yard in Ratlam Division of Western Railway on 07.05.2026.
During the Railway Board meetings held on 06.05.2026 and 13.05.2026, the SPAD incident involving Train No. 12392 at Fatuha Railway Station under Danapur Division of East Central Railway on 27.04.2026 and the side-collision incident involving an electric light engine at Dalauda Station Yard in Ratlam Division of Western Railway on 07.05.2026 were discussed.
A. Instructions Issued by Railway Board
- The crew should be counselled for timely application of brakes and should not assume the aspect of the next signal.
- All precautions for Light Engine movement should be taken during running.
- Light Engine running speed graphs should be analysed for the braking behaviour of the crew at the divisional/zonal level, similar to the braking pattern of trains.
- Accident cases involving Light Engine, Tower Wagon and Track Machine should be analysed.
B. Intensive Counselling of Running Staff
- Strict adherence should be ensured to the prescribed speed limits for โYYโ and โYโ signal aspects, without assuming the aspect of the next signal. ALPs should remain vigilant while passing caution signals, keep their hand on the RS valve and promptly operate it whenever train speed exceeds the defined limits.
- Repeated callout of โRed Aheadโ after passing a โYโ signal, until the train reaches a dead stop or the signal ahead is lowered, should be emphasized through regular counselling.
- Practice of emergency brake application through the RS valve should be continued to build confidence among ALPs.
- Loco Pilots should be specifically counselled to apply SA-9 brake instead of A-9 brake while working Light Engine. The crew should also be sensitized that a Light Engine has a higher emergency braking distance compared with coaching stock, requiring more restrictive speeds at โYYโ and โYโ aspects.
C. Monitoring of LP & ALP Behaviour
- Apart from counselling, the braking technique of individual Loco Pilots at different signals should be analysed through braking pattern/braking envelope analysis .
- Bulk analysis of speed at Yellow signals , using RTIS and data logger, should be carried out regularly to identify Loco Pilots whose braking behaviour indicates a higher likelihood of SPAD.
D. Instructions for Trial Run
- During trials using Light Engine, it should be ensured that CLIs accompany the Loco Pilot.
- The paper authority for movement in non-signalled lines should clearly indicate the permitted speed and the location for brake application, considering topography, brake power and other relevant factors. These details should also be verified by the accompanying CLI.
- The specified brake-application location should be prominently indicated to the Loco Pilot by placing a competent railway servant with a hand signal flag/lamp.
Key Safety Emphasis: Running staff must follow prescribed signal speeds, avoid assuming the next signal aspect, apply brakes in a timely manner, and exercise additional caution during Light Engine operations and trial runs.