SPAD of DN Starter Signal line no. 5 of Ayodhya by crew of train no. DN nTV/ Goods
Safety
Circular Number:
CKP/CIR/Safety/09-07-2026/10.244.207.211/1
đź“– Viewed 46 times
SPAD of Down Starter Signal – Ayodhya
Down NTV/Goods Train • Line No. 5
â—ŹIncident Overview
Contributing Factors
Key observations identified during the incident analysis
Poor Yard Familiarity
Goods trains normally do not operate via Line No. 5. The crew was driving through this line after more than a year.
Curved Track
Line No. 5 has a 3° curve, making timely recognition of the starter signal more difficult.
Unusual Signal Location
The starter signal was positioned approximately 100 metres ahead of the normal platform-end location.
Signal Not Observed in Time
The crew failed to identify the starter signal sufficiently early.
Signal Visibility Obstruction
Visibility was around 250 m from the ALP side, while visibility from the LP side was obstructed for approximately 50 m by the coach display unit.
RS Valve Not Operated
The ALP failed to operate the RS valve during the incident.
FSD Programming Issue
The FSD was programmed for the main-line starter, which was located 100 metres ahead of the starter of Line No. 5.
Lessons Learned & Corrective Actions
Measures recommended to prevent recurrence
Regular Yard Learning
Yard learning of crew should be updated every 6 months, particularly when crew members are not regularly operating on all lines.
Improve Signal Sighting
Signal sighting committees should identify even minor visibility issues rather than relying solely on the minimum requirement. Although the manual specifies a minimum sighting distance of 200 metres, an adequate target of approximately 400 metres should be pursued.
Review FSD Programming
FSD programming should be reviewed for multiple-line yards. The system may need to be programmed to recognize the nearest applicable starter signal among the platforms.
Key Takeaway
The SPAD resulted from a combination of poor route familiarity, unusual signal placement, restricted signal visibility, crew oversight, failure to operate the RS valve, and FSD programming limitations. Strengthening crew route learning, signal visibility, and system configuration can significantly reduce the risk of recurrence.